Bhārata Strata · Maharashtra · Gondia · urbanisation trajectory
Urbanisation & built-up trend — cell 4760000014
How the built environment has grown at this Gondia locality cell — GHSL settlement growth as a Theil–Sen slope with its GUM standard error + Mann–Kendall test, and NRSC's two-epoch land-use change. Missing is never zero.
Built-up growth · GHSL
Built-up growth trend
+2,113 ± 575 m²/decade
significant · p = 0.017
Mann–Kendall τ
1.0
5 GHSL epochs
Built-up by 2020
1.3%
13,278 m² built
Recent − early built
+9,398 m²
log-growth 1.23
witness: tier_w_v1 — GHSL built-up surface, Theil–Sen ± GUM SE + Mann–Kendall · 5 epochs · as of 2020-12-31 00:00 UTC
Land-use change 2004 → 2018 · NRSC
Built-up
0% → 3%
+2 pp · 16.1× relative growth
Cropland
52% → 46%
-5 pp
Forest
38% → 41%
+3 pp
Water
11% → 5%
-6 pp
witness: tier_v_v1 — NRSC LULC 250k two-epoch super-class change · 2 epochs · as of 2018-12-31 00:00 UTC
Re-witness this trajectory
curl -s https://api.gridrock.ai/mcp -H 'Content-Type: application/json' \
-H 'Accept: application/json, text/event-stream' \
-d '{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{"name":"read_witnesses",
"arguments":{"admin_code":476,"cluster_id":4760000014,"include_trajectory":true}}}'Scope: the live MH-36 cube. GHSL built-up and NRSC LULC change are pinned, sha-verified standalone witnesses; this page reads the live engine and never interpolates or back-casts.